WSDOT Begins Fieldwork on New SR520 Bridge
From WSDOT:
http://www.wsdot.wa.gov/News/2010/07/23_SR520GeoTech.htm
Work begins on the new SR 520 bridge by drilling sample borings into the Lake Washington floor to provide data for anchor design for the new 520 bridge.
Ben