Sound Transit to Speed Up Construction Of Link Extension to South 200th
From Sound Transit:
http://www.soundtransit.org/About-Sound-Transit/News-and-events/News-releases/S-200th-light-rail-extention-expedited.xml
The schedule will be accelerated so that the Link extension to South 200th Street (just South of the airport) can be completed by 2016, the same time as the University Link extension will open.
This is great news as this extension, besides moving the line further South, will add much-needed parking. The only lot currently along the line is at Tukwila, and it is full by 8am or earlier.
Ben